Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
586 KB
Publication Date:
Jan 1, 2008

Abstract

The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was the first contract to be awarded as an Olympic project and is on the critical path for the proposed Olympic Park as the construction of the Olympic village, stadium and other venues cannot begin until the tunnels are complete, the cables installed and the overhead power lines removed. The tunnelling works for the scheme include two parallel tunnels between Hackney and West Ham. Each tunnel is approximately 6 km in length. One tunnel is 4.15 m ID and connects the National Grid substations. The other is 2.82 m ID and connects the EDF Energy substations. The tunnels were constructed through mixed ground using four earth pressure balance tunnel boring machines. These were driven simultaneously from two drive shafts within a single site. The 12 km of main tunnels were constructed within a year from start to finish, with completion in June 2007. The shafts range between 6 m and 15 m ID. These were constructed using a combination of caisson sinking and underpinning techniques. Dewatering was adopted to suit the groundwater conditions.Other works include the design and construction of the head house buildings, cable and ventilation culverts, mechanical and electrical (M&E) installations and all associated works. In addition to the above, a further 1 km of tunnel and two shafts were added to the project scope connecting the EDF Energy tunnel to the substation at Bow. These additional works provided further challenges to the project to ensure that these works were constructed within the program constraints for the 2012 London Olympics. This involved refurbishing one of the tunnel boring machines from the main EDF Energy tunnel drives and relaunching the machine to construct the Bow tunnel. The Bow tunnel was constructed within two and a half months, with the tunnel boring machine breaking through in August, ahead of schedule. The main challenge presented by this project is the program constraints. This project outlines the requirement for team work between the client, stakeholders, contractor and designer in order to provide program certainty. A close working relationship between the contractor and the designer is required to provide value engineered, time-saving solutions to mitigate the risks associated with the design and construction program.
Citation

APA:  (2008)  Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

MLA: Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project. The Australasian Institute of Mining and Metallurgy, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account