Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From Coal

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 30
- File Size:
- 2750 KB
- Publication Date:
- Jan 1, 1977
Abstract
A 200 pound per hour Magnex Pilot Plant was designed and constructed. A non-compliance Eastern Coal which would generate more than 2.0 lb of SOZ per million Btu upon burning was brought into compliance (less than 1.2 lb of S02 per million Btu) during continuous operation of the pilot plant. Approximately 85 percent of the pyritic sulfur was removed while recovering 86 percent of the Btu of the feed coal. Pilot plant operation is summarized and preliminary economics presented. Present status of the Magnex Program is reviewed.
Citation
APA:
(1977) Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From CoalMLA: Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From Coal. Society for Mining, Metallurgy & Exploration, 1977.