Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 1018 KB
- Publication Date:
- Jan 1, 2000
Abstract
WMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchmark in the mining industry. To achieve a production increase from 3.4 to 9.25 Mtpa from an underground mining operation in two years was a major challenge, it was essential to review the overall materials handling system from æthe face to the stockpileÆ. The challenge was two-fold:How to deliver 30 000 tonne of ore per day to the processing plant, from a single underground mine? To provide the processing plant with a consistent metallurgical feed. This paper traces the transformation from the old to the new materials handling system at Olympic Dam.
Citation
APA: (2000) Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ
MLA: Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ. The Australasian Institute of Mining and Metallurgy, 2000.