Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
1018 KB
Publication Date:
Jan 1, 2000

Abstract

WMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchmark in the mining industry. To achieve a production increase from 3.4 to 9.25 Mtpa from an underground mining operation in two years was a major challenge, it was essential to review the overall materials handling system from æthe face to the stockpileÆ. The challenge was two-fold:How to deliver 30 000 tonne of ore per day to the processing plant, from a single underground mine? To provide the processing plant with a consistent metallurgical feed. This paper traces the transformation from the old to the new materials handling system at Olympic Dam.
Citation

APA:  (2000)  Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ

MLA: Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ. The Australasian Institute of Mining and Metallurgy, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account