Maximiser ? Beyond Pit Optimisation

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 9
- File Size:
- 311 KB
- Publication Date:
- May 1, 2007
Abstract
Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the costs that strategic scheduling decisions are based on. This can affect all mines, but is particularly true for commodities requiring blending. Adoption of Maximiser technology addresses these cost based scheduling and blending challenges.
Citation
APA:
(2007) Maximiser ? Beyond Pit OptimisationMLA: Maximiser ? Beyond Pit Optimisation. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.