Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 907 KB
- Publication Date:
- Jan 1, 1971
Abstract
The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. A deterioration in metallurgical performance at each concentrator occurred as a result, with increased loss of lead and zinc to residues. Investigations to determine the reasons for this problem and methods to counteract it have been undertaken. This paper outlines the effects of cement on lead-zinc beneficiation at Broken Hill and presents an interim report on attempts to overcome the metallurgical deterioration.
Citation
APA: (1971) Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited
MLA: Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited. The Australasian Institute of Mining and Metallurgy, 1971.