Method Selection At Questa

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 7
- File Size:
- 630 KB
- Publication Date:
- Jan 1, 1981
Abstract
BACKGROUND AND PROJECT DESCRIPTION A 16.5 kt per day underground molybdenum mine is being developed at Questa in northern New Mexico by Molycorp, Inc., a wholly-owned subsidiary of Union Oil Company of California. Small scale underground mining first began in 1920 and large scale open-pit mining was initiated in 1965, but because of the high stripping ratio, surface mining is being phased out. Construction of the underground mine began in 1979, and first production is scheduled for 1983. Full production of 9 Gg of molybdenum per year will be reached in 1984. Access to the mine will be through a service shaft, development shaft, and a conveyor decline. 'The service shaft, 7.3 m in diameter and 396 m deep, will be used for personnel, supplies, development muck, and fresh air intake. It will be equipped with a large, double-deck man and material cage. A double-drum hoist will be used for cage hoisting and will handle up to a 27-t load in balance with a counterweight. Development muck will be loaded into skips in balance and a single-drum auxiliary hoist will provide secondary access. The 396-m-deep, 4.3-m-diameter development shaft will be used for initial mine development, mine exhaust air, and a slick line pass for concrete entering the mine. The development shaft is located 400 m north of the service shaft. Run-of-mine ore will be transported from one of two 1.4-kt storage pockets by a 1.2-m-wide conveyor belt located in the 10°, 1980-m-long, 5.0-m-wide, and 4.6-m-high decline. The decline conveyor belt has a centerline length of 2229 m and a vertical rise of 363 m. It will be powered by four 448 kw motors driving a single drive pulley. There will be two 1.2 m transfer belts on the surface with centerline lengths of 322 m and 542 m. All three conveyor belts will be reinforced with steel cables. On the surface, in addition to the headframes and hoist houses for the two vertical shafts, a large maintenance shop, warehouse, compressor house, change house, main office building and timber framing building have been constructed.
Citation
APA:
(1981) Method Selection At QuestaMLA: Method Selection At Questa. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1981.