Microtunneling For Utilities Under Harold Railroad Interlocking

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 1351 KB
- Publication Date:
Abstract
Microtunneling provides a necessary solution for multiple utility crossings associated with the New York Metropolitan Transportation Authority Capital Construction Company?s (MTACC) Eastside Access Project for the Long Island Rail Road. Construction of four TBM tunnels and their approach structures at the eastern end of the project in Sunnyside, Queens required significant modification and expansion of the railroad infrastructure at this location. Maintenance of railroad traffic during project construction is a principal requirement. As a consequence fourteen (14) utility crossing segments are being installed under active traffic by microtunneling methods. Microtunnels were installed in a variety of conditions including depths, types of soils and construction restraints.
Citation
APA:
Microtunneling For Utilities Under Harold Railroad InterlockingMLA: Microtunneling For Utilities Under Harold Railroad Interlocking. Society for Mining, Metallurgy & Exploration,