Mine Design to Economic Evaluation ù The Missing Link?

The Australasian Institute of Mining and Metallurgy
B Cope D Webb N Hastings
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
9
File Size:
1155 KB
Publication Date:
Jan 1, 2003

Abstract

A Feasibility Study was completed in late 2002 to ascertain the risk and reward profile from the proposed deepening of operations at Perseverance Nickel Mine in Western Australia. The system and approach adopted to this brownfields extension work is outlined and the main components of the study are overviewed. In particular, emphasis is given to the integration of mine design and scheduling tools through to financial evaluation. Detailed comment is given on the ability of the system used to provide a robust project schedule complete with 3D animation. The level of importance in eliminating scheduling errors is demonstrated in relation to the reported bottom line viability of the project. It is suggested that this is an area where brownfields Feasibility Studies have lacked clarity and authenticity, leading to the creation of an unrealistic benchmark for project implementation.
Citation

APA: B Cope D Webb N Hastings  (2003)  Mine Design to Economic Evaluation ù The Missing Link?

MLA: B Cope D Webb N Hastings Mine Design to Economic Evaluation ù The Missing Link?. The Australasian Institute of Mining and Metallurgy, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account