Mine Planning

Canadian Institute of Mining, Metallurgy and Petroleum
G. Scott Zimmer
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
9
File Size:
7004 KB
Publication Date:
Jan 1, 1978

Abstract

Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty in evaluating fibre grade and distribution, combined with a high-wall phase or push-back mining system, requires continuous modification to designs and schedules based on a cumulative evaluation of equipment performance and prediction versus production. To expedite the planning sequence, a mini-computer system has been introduced which allows emphasis to be placed on optimizing designs, exempting personnel from manual calculations and tabulations.
Citation

APA: G. Scott Zimmer  (1978)  Mine Planning

MLA: G. Scott Zimmer Mine Planning. Canadian Institute of Mining, Metallurgy and Petroleum, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account