Minerals Beneficiation - Manganese Upgrading at Three Kids Mine, Nevada

The American Institute of Mining, Metallurgical, and Petroleum Engineers
S. J. McCarroll
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
5
File Size:
707 KB
Publication Date:
Jan 1, 1955

Abstract

Fig. 1—The belt shown at right carries filter cake to mixing station over calciner. Crude ore conveyors appear in right background. THE Three Kids mine, some six miles east of Henderson, Nev., is in a typical southwest desert area, with high dry summer heat and cool to cold winter seasons. The manganese deposit was located during World War I.' During this period 15,000 to 20,000 tons of ore assaying up to 41 pct manganese were shipped. Interest in the deposit was not revived until the middle thirties, when experiments on the ore were initiated. Test work indicated possible recovery of only 70 pct by flotation, but in 1941 additional work was done at the Boulder City pilot plant of the U. S. Bureau of Mines and also by M. A. Hanna Co. As a result, the Manganese Ore Co. was formed and a plant utilizing the SO2 process was constructed. Numerous operation difficulties ensued, and the plant. was closed when the manganese situation in the country eased. In 1949 Hewitt S. West initiated negotiations to acquire the plant. In 1951 Manganese, Inc., was formed and contract entered into with the General Services Administration to supply 27 million units of metallurgical grade manganese in the form of nodules to the national stockpile. A second contract was made to upgrade 285,000 tons of stockpile ore. Test work was undertaken by the Southwestern Engineering Co. and likewise by the Boulder City pilot plant at the U. S. Bureau of Mines. Results obtained indicated the commercial feasibility of the flotation process. Construction of the plant, which is shown in Figs. 1 and 2, was started in June 1951, and operations on a break-in basis began in September 1952. Apart from the usual starting difficulties two major disasters caused serious setbacks, one a kiln failure in February 1953, and the other a fire that destroyed the flotation building in June of the same year. The nodulizing section of the plant resumed operation in November, and the flotation section in January 1954. The ore minerals are chiefly wad,* with minor amounts of psilomelane, and occur in sedimentary beds of volcanic tuff. The ore is overlain with beds of gypsum which outcrop or may be covered with surface gravel. Intermediate beds of red and white tuff occur frequently with lenses of red and green jasper and stringers of gypsum and calcite. Small amounts of iron are present; lead content averages about 1.0 pct and minute amounts of copper and zinc are found. Barite, celestite, and bentonite are present. Since these are made up of minute asicular crystals, moisture content is very high, averaging about 18 pct. Ore reserves have been estimated at 3 million tons averaging 18 pct Mn2 and up to 5 million tons after grade is dropped to 10 pct Mn. A good part of the orebody was stripped of overburden by the previous operating company . Approximately 50 pct of the ore, representing more than 60 pct of the manganese, can be mined by open-cut methods. A system for underground min- . ing has not yet been decided on. Open-cut mining with benches of 20 ft has proved satisfactory. Although the ore is soft and appears dry and dusty it has a certain resilience, probably due to the porosity and moisture which makes drilling and fragmentation difficult. Wagon drills have been abandoned in favor of the Joy 225-A rotary drill which will put down a 43/4 -in. hole at the rate of 2 ft per min. Holes are spaced in a pattern with 8 to 9-ft centers. Forty percent powder has been used, but better breaking to 2-ft size is obtained with low velocity bag powder of 30 pct strength. Loading is done with one 21/2-yd shovel, and cleanup follows with one D-7 bulldozer. The ore is hauled with Euclid trucks about 1000 ft from the pit to a blending pile, where the daily mine production is spread in layers by bulldozing until approximately one month's mill feed is accumulated. A new pile is then started and mill feed is drawn from the first pile by one 13/4-yd shovel and Euclid trucks, with a haul of approximately 500 ft. Mining is performed by an independent contractor with engineering and supervision by the company staff. Early test work indicated that the manganese could be floated with soap, a wetting agent, and fuel oil to give a recovery of better than 75 pct with a grade of 43 pct Mn. The concentrate when nodulized with coke would upgrade to 46 pct Mn or over, and the lead volatilized to 0.6 pct residual.
Citation

APA: S. J. McCarroll  (1955)  Minerals Beneficiation - Manganese Upgrading at Three Kids Mine, Nevada

MLA: S. J. McCarroll Minerals Beneficiation - Manganese Upgrading at Three Kids Mine, Nevada. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1955.