Minerals Beneficiation - Practical Design Considerations for High Tension Belt Conveyor Installations

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 15
- File Size:
- 1313 KB
- Publication Date:
- Jan 1, 1952
Abstract
THE high tension belt conveyor is introducing a new and tremendously expanded era of low cost bulk material handling. High tension belt conveyors are generally those installations involving very long centers, high lifts, or drops, in which the belts are stressed up to their maximum tension values, and further, where the belt construction provides tension capacity far beyond what is possible with conventional belt constructions. With these high tension installations, the magnitude of the forces involved demands careful refinement of accepted design practice in order to achieve optimum balance of all factors. No attempt will be made to evaluate the relative merits of belt conveyor haulage with other means of transportation. For present purposes, it is assumed this has already been done in favor of belt conveyor. Neither will any attempt be made to evaluate the various conveyor belt constructions now available or to balance the advantages of various types of mechanical equipment. It is also assumed that the basic haulage information on which the conveyor design is based is accurate and complete. A sustained maximum, uniform load on the belt at all times must be achieved through proper feed control and the use of adequate surge storage to level the peaks and valleys of any varying demand for the material being handled. General Belt Capacity Considerations The belt conveyor capacity tables published by various belting and conveyor equipment manufacturers vary to a considerable degree, and the ratings given are quite conservative. Of necessity, these published ratings are based on the handling of average materials under average conditions. In applying a high tension belt, all possible capacity from the belt must be obtained in order to hold its width to a minimum and thereby limit the initial cost. Two factors are involved, loading to maximum cross section area and traveling at a maximum practical speed. Belt Loading: Proper treatment of the loading of the belt will result in maximum cross section to the load, and published capacity ratings can be exceeded, sometimes by appreciable margins. On the 10-mile conveyor haul used in the construction of Shasta Dam, California, although the rated capacity of the belt line was 1100 tons per hr, at times the system handled peak loads of 1400 tons per hr, almost 25 pct better than the rated capacity. One of the large coal companies has been able to exceed rated capacity by as much as 50 pct. Loading conditions which must be controlled are: 1. Large lumps must be scalped off and rejected or the load must be primary crushed before being placed on the belt. 2. The material weight per cubic foot must be accurate, must be known for all the materials being handled, and must be known for the complete range of conditions of the individual material being handled. Long centers and high lifts magnify small differences into serious proportions. 3. Uniform feeding to the belt is most important. Various types of feeders are available, which can be used to place a constant predetermined volume of material on the belt, or, where an appreciable range of material weight exists, through electrical control actuated by current demand, to place a predetermined uniform tonnage on the belt. One long slope belt in a coal mine in Pennsylvania is being fed at three separate stations with the controls so arranged that whenever the maximum load is going onto the belt from the first station, the other two stations automatically cut out. Whenever the load from the first station drops back, the other two stations again automatically cut in. 4. Careful design of the chutes and skirts is necessary to get the load centered on the belt with a minimum of free margin along each edge. Some free margin at the edge of the belt is necessary to prevent spillage, but if the load can be kept accurately centered, this free margin area can be reduced, and more material can be carried on the belt. What can be accomplished in this respect will vary widely, depending on the nature of the material being hauled. The chute and skirt design must also protect the belt. 5. The design of chutes and skirts should also get the load traveling in the same direction and close to belt speed, so that the load comes to rest on the belt as quickly as possible. The design of the chutes and skirts is worthy of careful study, and after a system is put into operation it should be experimented with to get the best results. Belt Speed: High belt speeds should be used in high tension work. Obviously, high belt speeds enable haulage on a narrower belt, reducing initial cost. The major portion of belt wear takes place at the loading point and around the terminal pulleys. The
Citation
APA:
(1952) Minerals Beneficiation - Practical Design Considerations for High Tension Belt Conveyor InstallationsMLA: Minerals Beneficiation - Practical Design Considerations for High Tension Belt Conveyor Installations. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1952.