Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 1130 KB
- Publication Date:
- Jan 1, 2008
Abstract
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project challenges after the completion of the bored tunnels was the excavation of six cross passages within alluvial geology below the water table and with low ground cover. Sequential excavation methods were employed and this paper details the design, ground treatment, support measures, and construction methods used to mine these cross passages beneath the congested urban streets of the City of Los Angeles.
Citation
APA:
(2008) Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsMLA: Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels. Society for Mining, Metallurgy & Exploration, 2008.