Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

Society for Mining, Metallurgy & Exploration
Christophe Bragard
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
1130 KB
Publication Date:
Jan 1, 2008

Abstract

The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project challenges after the completion of the bored tunnels was the excavation of six cross passages within alluvial geology below the water table and with low ground cover. Sequential excavation methods were employed and this paper details the design, ground treatment, support measures, and construction methods used to mine these cross passages beneath the congested urban streets of the City of Los Angeles.
Citation

APA: Christophe Bragard  (2008)  Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

MLA: Christophe Bragard Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account