Mining Methods At Pine Creek Mine

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 5
- File Size:
- 2003 KB
- Publication Date:
- Jan 10, 1957
Abstract
PINE Creek mine of Union Carbide Nuclear Co. is some 23 miles northwest of Bishop, Calif., in the Sierra Nevada Mts. Office and mill are 7800 ft above sea level, the 1500 level portal is at 9300 ft, the A level portal at 10,800 ft, and the 3050 portal at 11,500 ft. Original claims were located in 1916, and the mine worked intermittently until 1936, when it was purchased by Union Carbide Corp. Since then the property has been operated continuously, except for two brief periods when operations were suspended because of manpower shortages. Mine production through 1956 amounted to 2,792,425 dry tons of ore.
Citation
APA:
(1957) Mining Methods At Pine Creek MineMLA: Mining Methods At Pine Creek Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1957.