Mining Simulation For Room And Pillar Coal Operation - Synopsis (35020da1-a41b-47f2-ae4d-a98b4b67bef1)

The Southern African Institute of Mining and Metallurgy
S. P. Pereira
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
4
File Size:
778 KB
Publication Date:
Jan 1, 2012

Abstract

The mechanized mining cycle using loaders and shuttle cars had its peak in terms of usage in the mining industry during 1950 through 1960. In Brazil, this system is still used at underground coal mines in southern Santa Catarina coal basin. With the aim of investigating the benefits of a new mining scheme using the room and pillar method for these local mines, a computational simulator model was developed in order to investigate the mining cycle. This paper presents the methodology used to develop the simulator and the results that the simulation shows regarding impact of the proposed new scheme on mining productivity.
Citation

APA: S. P. Pereira  (2012)  Mining Simulation For Room And Pillar Coal Operation - Synopsis (35020da1-a41b-47f2-ae4d-a98b4b67bef1)

MLA: S. P. Pereira Mining Simulation For Room And Pillar Coal Operation - Synopsis (35020da1-a41b-47f2-ae4d-a98b4b67bef1). The Southern African Institute of Mining and Metallurgy, 2012.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account