Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 1508 KB
- Publication Date:
- Mar 18, 2015
Abstract
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New Guinea, was operated by Misima Mines Pty Ltd, a subsidiary of Placer Dome Asia Pacific Limited (Placer), between 1988 and 2004. During this period, the mine produced 3.7 Moz of gold and 22.2 Moz of silver. In June 2012, the Special Mining Lease for the property was surrendered and incorporated into an Exploration Licence (EL). WCB Resources Ltd (WCB) entered into an exploration farm-in agreement with Pan Pacific Copper covering this EL.In June 2013, WCB published a new mineral resource of the Umuna deposit at Misima. All the drill hole data used for estimation was historical data collected by the previous owners of the Misima mine between 1977 and 2001. No new drilling was carried out by WCB. Confidence that the data could be relied on was provided by detailed interrogation of the existing data, reconciliation of the new resource model against production data and significant input from individuals who had previously been involved with the data collection, resource estimation and production activities of the Misima mine during its operation.This extended abstract will consider the challenges associated with locating, retrieving and validating historical data to use as inputs to produce an updated Mineral Resource estimate and comment on the material value of appropriate data storage, documentation and record keeping through the life of a project. It will also comment on the value of WCB obtaining access to the intellectual knowledge of many professionals that were former employees of Placer. This knowledge ensured that all the historical data that should have been available was sought out and accessed.CITATION:Konopa, S, Lewis, R, Logan, R, Switzer, C and Stoker, P, 2015. Misima gold mine – a case study in the use of historical data for an updated mineral resource estimate, in Proceedings PACRIM 2015 Congress, pp 579–586 (The Australasian Institute of Mining and Metallurgy: Melbourne)."
Citation
APA:
(2015) Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource EstimateMLA: Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate. The Australasian Institute of Mining and Metallurgy, 2015.