More Cost Estimates on Taconite

The American Institute of Mining, Metallurgical, and Petroleum Engineers
AIME
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
1
File Size:
85 KB
Publication Date:
Jan 1, 1950

Abstract

The Taconites Are Ready, the editorial appearing on P. 933 of the September issue, has provoked comment from several informed engineers to the effect that the indicated profit margin was considerably exaggerated. The cost figures in the editorial, taken from the Congressional Record, were characterized as inaccurate by some correspondents. The theme of the story was, however, substantiated in the announcement (P. 1023, October) that Republic and Armco had joined forces in a $160 million project for taconite development. Chief among the dissenters was E. W. Davis, , Director of the Mines Experiment Station at the University of Minnesota. Mr. Davis has worked up the following set of cost figures:
Citation

APA: AIME  (1950)  More Cost Estimates on Taconite

MLA: AIME More Cost Estimates on Taconite. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1950.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account