Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

Society for Mining, Metallurgy & Exploration
John F. MacDonald
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
20
File Size:
1200 KB
Publication Date:
Jan 1, 1985

Abstract

This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent support system, consisting of 24 concrete filled perimeter drifts, before excavating the mass core. General construction procedures used during the construction of the perimeter drifts are described.
Citation

APA: John F. MacDonald  (1985)  Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

MLA: John F. MacDonald Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method. Society for Mining, Metallurgy & Exploration, 1985.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account