Murrin Murrin CCD1 Rake Mechanism Modification: the Decision and the Result (cec1ce81-ec33-4e69-ab4a-ed843ba61e4f)

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 20
- File Size:
- 882 KB
- Publication Date:
- Jan 1, 2004
Abstract
Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and operational changes and the CCD circuit is no exception. The decision to install, the installation and the results of the CCD1 rake-lift mechanism and feedw ell dilution system are discussed in this paper. The installation was justified on improved operational robustness and an increase in the in the underflow density of 1% (per cent w/w). At approximately the same time process modifications in the solution neutralisation circuit were implemented and these changes altered the rheology of the slurry reporting to CCD1. Since the modifications to CCD1 and the solution neutralisation circuit, the CCD circuit has averaged a 2% improvement in the circuit underflow density. The CCD1 modification was completed on time and mechanically has performed well. From a risk point of view, the central rake-lift and Turbodil® dilution system add a degree of freedom and robustness to CCD1 operation that has extended the range of operational confidence. In this respect, the modification has been a success and is complementary to solution neutralisation improvements.
Citation
APA:
(2004) Murrin Murrin CCD1 Rake Mechanism Modification: the Decision and the Result (cec1ce81-ec33-4e69-ab4a-ed843ba61e4f)MLA: Murrin Murrin CCD1 Rake Mechanism Modification: the Decision and the Result (cec1ce81-ec33-4e69-ab4a-ed843ba61e4f). Canadian Institute of Mining, Metallurgy and Petroleum, 2004.