Myuna Multi Seam Colliery Ventilation

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
547 KB
Publication Date:
Jan 1, 1983

Abstract

Myuna Colliery long term ventilation requirements were included as part of the overall planning of colliery construction and underground development. Ventilation, during the simultaneous sinking of two drifts and the downcast shaft, was accomplished by established methods of ducted exhaust and blower fans. Drivages for the 3 seam interconnections of shaft and drifts were ventilated by extension and duplication of the exhaust systems. Ventilation, for the below seam extension of the belt drift, construction of between seam and below seam bins, and the completion of a circular between seam drift, required a step by step changeover to a temporary main ventilation exhaust fan mounted adjacent to the top of the completed downcast shaft. The second, permanent upcast, shaft was commenced and colliery production started one seam at a time, using the transport drift, while the underground bins, belt and between seam drifts were completed. The uocast shaft was completed and a connection made in the upper seam, completing all contract mining and allowing the main fan to be erected. The permenent twin centrifugal fan system was installed, commissioned and test run to
Citation

APA:  (1983)  Myuna Multi Seam Colliery Ventilation

MLA: Myuna Multi Seam Colliery Ventilation. The Australasian Institute of Mining and Metallurgy, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account