Nacimiento Lake Tap

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 645 KB
- Publication Date:
- Jan 1, 2008
Abstract
In 2005, Black & Veatch Corporation began designing a raw water conveyance system for San Luis Obispo County from Lake Nacimiento to the city of San Luis Obispo. The first element of the water transfer system will be a raw water pump station and lake tap. The wet well of the pump station will consist of a concrete lined shaft approximately 180 feet deep constructed in the very incompetent sandstone of the Vacqueros Formation. The lake will be wet tapped at approximately 172 feet below grade using a slurry earth pressure balance tunnel boring machine. The 48 to 72-inch finished diameter microtunnel will be approximately 500 feet in length. Construction is scheduled to begin in the winter of 2007.
Citation
APA:
(2008) Nacimiento Lake TapMLA: Nacimiento Lake Tap. Society for Mining, Metallurgy & Exploration, 2008.