New American Tunneling Technique - NATT Oakwood Beach Interceptor Project Contract T-13

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 892 KB
- Publication Date:
- Jan 1, 1993
Abstract
The paper discusses design and construction of a 1.8 meter (6 ft.) diameter tunnel installed under complex geology of Staten Island, New York. Contract T-13 is a section of the Oakwood Beach Water Pollution Control Project constructed for New York City Department of Environmental Protection. A knowledge of the subsurface conditions and difficulties experienced on the adjacent contracts called for an innovative approach to handle tunneling under 12 to 17 meters (40-55 ft.) of water in the variable subsurface conditions. This paper describes tunnel design and construction utilizing continuous grouting during advancement of tunnel boring machine and installation of liner plates.
Citation
APA:
(1993) New American Tunneling Technique - NATT Oakwood Beach Interceptor Project Contract T-13MLA: New American Tunneling Technique - NATT Oakwood Beach Interceptor Project Contract T-13. Society for Mining, Metallurgy & Exploration, 1993.