New Gas Handing System For Caletones Smelter

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 17
- File Size:
- 557 KB
- Publication Date:
- Jan 1, 1992
Abstract
This paper discusses the study, design and implementation of the new gas handling system for the Caletones Smelter of Codelco-Chile. A discussion on design conditions for a future Sulphuric Acid Plant using Teniente Converter gases is also included. The old system which started to be modified in 1985 and relied on natural draft and used balloon flues, resulted in a limited gas handling capacity for operation under future process conditions. This system also caused excessive fugitive gases in the smelter working areas. The new system permits handling of process gases from the higher capacity Teniente Converters Installed in 1987-1989 improving the gas handling of the reverberatory furnaces and Peirce-Smith converters as well as the environmental conditions of the smelter. This system utilises improved converter gas hoods, evaporative cooling and electrostatic precipitators gas cleaning, and is based on natural draft.
Citation
APA:
(1992) New Gas Handing System For Caletones SmelterMLA: New Gas Handing System For Caletones Smelter. The Minerals, Metals and Materials Society, 1992.