New Gas Handling System at Caletones Smelter

The Minerals, Metals and Materials Society
J. Boitano
Organization:
The Minerals, Metals and Materials Society
Pages:
17
File Size:
550 KB
Publication Date:
Jan 1, 1992

Abstract

This paper discusses the study, design and implementation of the new gas handling system for the Caletones Smelter of Cbdelco..Chile. A discussion on design conditions for a Mure Sulphuric Acid Plant using Teniente Converter.gases.is also included. The old system which started to be modified in 1985 and relied on natural draft and used balloon flues, resulted in a limited .gas handling capacity for operation under Mure process conditions. This system also caused excessive fugitive gases in the smelter working areas. The new system permits handling of process gases from the higher capacity Teniente converters installed in 1987-1989 Improving the gas handling of the reverberatory furnaces and Peirce-Smith converters as well as the environmental conditions of the smelter. This system utilises improved converter gas hoods, evaporative cooling and electrostatic precipitators gas cleaning, and is based on natural draft.
Citation

APA: J. Boitano  (1992)  New Gas Handling System at Caletones Smelter

MLA: J. Boitano New Gas Handling System at Caletones Smelter. The Minerals, Metals and Materials Society, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account