New Tailings Dam at Ardlethan Tin N.L.

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
745 KB
Publication Date:
Jan 1, 1978

Abstract

In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of experience in building such a dam "from scratch". Solutions are described land costs given.
Citation

APA:  (1978)  New Tailings Dam at Ardlethan Tin N.L.

MLA: New Tailings Dam at Ardlethan Tin N.L.. The Australasian Institute of Mining and Metallurgy, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account