New Tailings Dam at Ardlethan Tin N.L.

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 11
- File Size:
- 745 KB
- Publication Date:
- Jan 1, 1978
Abstract
In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of experience in building such a dam "from scratch". Solutions are described land costs given.
Citation
APA: (1978) New Tailings Dam at Ardlethan Tin N.L.
MLA: New Tailings Dam at Ardlethan Tin N.L.. The Australasian Institute of Mining and Metallurgy, 1978.