No 3. Services and Surface Area

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 36
- File Size:
- 1250 KB
- Publication Date:
- Jan 1, 1957
Abstract
In the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards 'located in the winder house.(b) Miscellaneous electrical indicating, control and signalling systems.(c) Telephone lines from the main internal automatic exchange located in the changehouse, the town exchange to the automatic exchange and also direct lines from the town exchange to selected offices.(d) Compressed air from the incoming 16-in. air main. (e) Water, both unfiltered and filtered; and the disposal of the following effluents:(f) Sewage from the area to the town sewage system.(g) Changehouse shower water to the regeneration area.(h) Storm water to the general mine surface drainage system leading out to the naturally drained area north of the No. 8 Shaft.
Citation
APA: (1957) No 3. Services and Surface Area
MLA: No 3. Services and Surface Area. The Australasian Institute of Mining and Metallurgy, 1957.