Observed loading behavior during cross passage construction at the Brisbane Airport link project

Society for Mining, Metallurgy & Exploration
John Kuyt Michelle Mangione Michael Mooney Zili Li
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
6006 KB
Publication Date:
Mar 1, 2017

Abstract

"Twin bored tunnels are commonly used for a variety of road and tunnel projects throughout the world.A major component of these twin tunnel projects is the construction of connecting cross passages that provide emergency access between tunnels and space for tunnel service equipment. Cross passages can present significant geotechnical risk and technical challenges to a project – support systems must be considered for redistributing loads around the mainline tunnel openings and supporting new loading resulting from excavation activities. Additionally, cross passages pose risks to construction schedule and cost because of their sequencing at the end of construction, so mitigation of schedule overruns can be critical. By observing field instrumentation data records from completed projects, a better understanding of the force development in each temporary structure can be achieved with indication of which structures are the most critical to support ground loads.This article discusses the data obtained during the Brisbane Airport Link construction project, a road tunnel located in Brisbane, Australia. Strain gauge instrumentation data from the precast segmental lining and propped opening steel sets is presented with relation to the construction sequence and local geology. Interpretations and conclusions based on the observed trends are proposed, with several key mechanisms affecting the loading and unloading identified.Brisbane Airport Link project overview. The Brisbane Airport Link project in Brisbane, Australia, connects central Brisbane to the airport located northeast of the downtown with more than 7 km (4 miles) of twin-bore road tunnels, two lanes each, with several caverns, interchanges and access ramps constructed along the alignment to connect to other key routes in the city. The project was executed under a public-private partnership (P3) scheme, funded and operated by the consortium BrisConnections. The main contractors were a joint venture of John Holland and Theiss, while the design was carried out by Arup and Parsons Brinckerhoff.Construction of the tunnels was conducted using a combination of 17 roadheaders and two 12.5-m (41-ft) double-shield Herrenknecht tunnel boring machines (TBM) (Harding & Francis, 2013). The TBMs were used in earth pressure balance- (EPB) type closed mode for the initial portion of their drive, starting at the northeast end of the alignment. Tunneling started in soft ground, weathered rock, and mixed face conditions initially, progressing to competent sedimentary rocks as the drive continued. Support was accomplished using a 12.1-m (39.8-ft) diameter steel fiber reinforced concrete (SFRC) segmental lining installed behind the TBMs in nine segments + one key arrangement. The innovative design of these segments is detailed in the paper by Harding and Francis (Harding & Francis, 2013). Ancillary roads and underground interchange caverns were constructed by sequential excavation techniques using roadheaders, accounting for nearly half of the total underground excavations."
Citation

APA: John Kuyt Michelle Mangione Michael Mooney Zili Li  (2017)  Observed loading behavior during cross passage construction at the Brisbane Airport link project

MLA: John Kuyt Michelle Mangione Michael Mooney Zili Li Observed loading behavior during cross passage construction at the Brisbane Airport link project. Society for Mining, Metallurgy & Exploration, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account