OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

The National Institute for Occupational Safety and Health (NIOSH)
K. B. Bengtson
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
191
File Size:
64819 KB
Publication Date:
Jan 1, 1979

Abstract

This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI gas induced crystallization process. The report consists of six volumes: I - Process Technology and Costs; II and III - Equipment Lists, Specifications and Quotations; IV and V - General Specifications; VI - Drawings. The process was selected by the Bureau of Mines as the more promising method to produce cell-grade alumina from clay based on the results of the two previous task reports under this contract: Task I - Comparison of Six Processes (alunite, anorthosite-lime sinter, clay/sulfurous acid, clay/nitric acid, clay/hydrochloric acid evaporative and gas-induced crystallization) and Task 2 - Comparison of Two Processes (clay/nitric acid and clay/hydrochloric acid - gas induced (crystallization). The pilot plant process utilizes a unique dual crystallization process to produce aluminum-chloride-hexahydrate crystals having sufficient purity when decomposed to meet stringent alumina product specifications. The size of the 25 TPD pilot plant has been selected to permit scale-up to commercial size plants of equipment, technical and economic parameters. The capital cost estimate for the pilot plant, exclusive of fee and escalation, for a southeastern U.S. location is $52,311,000 expressed in 1979 dollars. The total time required to construct the pilot plant including engineering and procurement is 32 months. The operating cost to produce the estimated 9,000 tons of alumina required for testing in Hall cells is $40,91[0],190 expressed in 1979 dollars.
Citation

APA: K. B. Bengtson  (1979)  OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

MLA: K. B. Bengtson OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs. The National Institute for Occupational Safety and Health (NIOSH), 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account