OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? Intro

The National Institute for Occupational Safety and Health (NIOSH)
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
284
File Size:
60578 KB
Publication Date:
Jan 1, 1979

Abstract

This appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equipment and motor list has been included in the first part of this appendix.
Citation

APA:  (1979)  OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? Intro

MLA: OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? Intro. The National Institute for Occupational Safety and Health (NIOSH), 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account