OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 270
- File Size:
- 58229 KB
- Publication Date:
- Jan 1, 1979
Abstract
This appendix contains the list of equipment, their corresponding number and their specifications with the quotations from the vendors/ manufacturers who can supply this equipment. The listings are arranged by process plant areas.
Citation
APA: (1979) OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro
MLA: OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro. The National Institute for Occupational Safety and Health (NIOSH), 1979.