OFR-155-81 Noise Control Of A Mine Operated Rail Personnel Carrier - Volume II. Underground Evaluation

The National Institute for Occupational Safety and Health (NIOSH)
A. G. Galaitsis
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
34
File Size:
9173 KB
Publication Date:
Jan 1, 1980

Abstract

The two volumes of this report summarize the noise control work performed by BBN on a rail personnel carrier operated in coal mines. Volume I of the report - submitted November 1977 - describes the aboveground work performed to identify the noise sources, design, fabricate, and install the treatments, and evaluate the treatments through noise and vibration tests. The current volume (II)-describes the underground work conducted by BBN to determine the deterioration, if any, of the treatments when the vehicle is operated normally in a mine. There were no significant changes in the acoustical performance or mechanical integrity of the treatments at the end of a three-month period.
Citation

APA: A. G. Galaitsis  (1980)  OFR-155-81 Noise Control Of A Mine Operated Rail Personnel Carrier - Volume II. Underground Evaluation

MLA: A. G. Galaitsis OFR-155-81 Noise Control Of A Mine Operated Rail Personnel Carrier - Volume II. Underground Evaluation. The National Institute for Occupational Safety and Health (NIOSH), 1980.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account