OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary Design

The National Institute for Occupational Safety and Health (NIOSH)
J. Ritchey
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
73
File Size:
19317 KB
Publication Date:
Jan 1, 1976

Abstract

This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport spoils in a typical Western surface coal mine. The studies show that such a system could be built to survive operational and climatic mining conditions, and that its implementation would offer a reduction in both acquisition and operating costs versus conventional mining units of comparable capacity. Reclamation costs can also be significantly reduced, and the total reclamation process accelerated, making the cross-pit conveyor system attractive to mine owners and environmentalists alike.
Citation

APA: J. Ritchey  (1976)  OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary Design

MLA: J. Ritchey OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary Design. The National Institute for Occupational Safety and Health (NIOSH), 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account