OFR-30-76 Design Evaluation For Development Of An Advanced Bolter Module - Section 1 - Summary

The National Institute for Occupational Safety and Health (NIOSH)
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
79
File Size:
23664 KB
Publication Date:
Jan 1, 1975

Abstract

This report covers the work performed by the Advanced Products Division of FMC Corporation under Bureau of Hines Contract J0155166, Design Evaluation for Development of an Advanced Bolter Module. FMC has evaluated the existing ISMS bolter designs, and the corrections and improvements in progress, including the effect of the three-chain magazine presently being fabricated, and recommends that a complete bolter module featuring a new magazine, safety post and lower stabilizer or similar device be designed, fabricated, and tested, A 29 week program is proposed which includes a four week demonstration. This module would eliminate those reliability problems not presently being solved and would provide a reliable bolter module for a production oriented miner/ bolter.
Citation

APA:  (1975)  OFR-30-76 Design Evaluation For Development Of An Advanced Bolter Module - Section 1 - Summary

MLA: OFR-30-76 Design Evaluation For Development Of An Advanced Bolter Module - Section 1 - Summary. The National Institute for Occupational Safety and Health (NIOSH), 1975.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account