Abstract
This study consists of four descriptive Sections covering respectively: a state-of-the-art literature survey on ungrounded and grounded power systems, a report on literature pertaining to human threshold limits of electric shock, an analysis of the performance requirements of isolated systems and a section on design and performance specifications for an isolated system the final section includes copies, and translations where applicable, of the most important articles on foreign mining practice as well as some technical publications which could be difficult to obtain elsewhere. Section 2 - Literature Survey In analyzing the available literature on ungrounded systems it became apparent that too strict an interpretation of Section 1.1 of the Contract would limit the survey in both period of time analyzed and in available literature which discussed several types of power systems. Therefore, the survey was expanded to cover approximately the past twenty-year period and to cover literature which addressed itself to both ungrounded and grounded power system operation. Section 2 gives a brief summary of this literature survey and lists the important papers and books which were examined.
Citation
APA:
(1972) OFR-39-72 Evaluation And Feasibility Study Of Isolated Electrical Distribution Systems In Underground Coal Mines ? Section 1 ? Executive Summary ? IntroductionMLA: OFR-39-72 Evaluation And Feasibility Study Of Isolated Electrical Distribution Systems In Underground Coal Mines ? Section 1 ? Executive Summary ? Introduction. The National Institute for Occupational Safety and Health (NIOSH), 1972.