OFR-46-76 Seismic Mine Monitor System - Introduction

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 43
- File Size:
- 10841 KB
- Publication Date:
- Jan 1, 1975
Abstract
[This i.untra t hds bmii III c'IIILt fur till- past 1':?:u yrlr;, Till-- wurir pnrfor rw:it '. ,JS hlui.rn dawn Ilttf lit Iu i eel i ih?IS( S. 1 hesrt aIII, Phase I Candor tlri I a lest It) donurnSlrale SeiSrrlir nurihudS to hu USi!d lot ttlr? rti?tei thin and Iu" ainnl ul trapped rrlinc:rs hitting (-)it the roof with a harnrner, Phase I' Design and cunStrur.t a permanent Seismic monitor System to rrlunrtur roof (ails arm r:xploslun', III ,r 'Vol king mine. Phase III - Ire dII an an i i irr for sVstl rtl Ii i`'Smltur air quality in till, niitii iiH II ? ir,iti tin; niln !III ;I I ,, i; Phase I V - Conduct 11(21 d tests of the seismic IT IUnit UT ieq system fur a period nl two 11IUIIIIIS. Phase, V - Condirct three test periods of the seismic system over a period of six mimilis. Detailed reports covering the wurk. done in Phases I, 11, and IV have been i : . r tr I - i t report will, therefore, cuni.entrate on the work perfurmed in Phases III anti V.]
Citation
APA:
(1975) OFR-46-76 Seismic Mine Monitor System - IntroductionMLA: OFR-46-76 Seismic Mine Monitor System - Introduction. The National Institute for Occupational Safety and Health (NIOSH), 1975.