OFR-83(2)-79 Operational Procedures And Maintenance Manual For Pumpable Roof Bolt Machine ? Introduction

The National Institute for Occupational Safety and Health (NIOSH)
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
172
File Size:
68722 KB
Publication Date:
Jan 1, 1976

Abstract

This manual covers the operation and lubrication procedures for the Eimco Pumpable Roof Bolting Machine. This machine meets U. S. Bureau of Mines Schedule 2G Approval. This manual is divided into three major parts: 1. Machine dimensions; 2. operating instructions and; 3. Lubrication. Whenever front or rear, right or left arc mentioned it is assumed that the reader is standing behind the machine looking toward the boom. The boom is at the front of the machine. Safety When leaving machine parked on an incline turn wheels into the rib or block wheels. Do not run over power cables. Make sure your power cable is up out of the way so others can't run over it. Machine has a fire suppressor system for the power unit. The remote actuator (pressure cylinder) is located at the operator's station. Components and service procedures on page 59.
Citation

APA:  (1976)  OFR-83(2)-79 Operational Procedures And Maintenance Manual For Pumpable Roof Bolt Machine ? Introduction

MLA: OFR-83(2)-79 Operational Procedures And Maintenance Manual For Pumpable Roof Bolt Machine ? Introduction. The National Institute for Occupational Safety and Health (NIOSH), 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account