Abstract
Three complete connector assemblies and ten separate contacts were submitted to a series of tests to establish the connector permissibility and compliance with the Bureau of Mines' research Contract H 0110423. Test Procedure TPC-0100 was coordinated, and the test plan approved by the Bureau as fully complying with the intent of the contract for the low voltage, medium voltage and high voltage A.C. connectors. The components and connector assemblies have been demonstrated in testing that they meet or exceed all the requirements of the test procedure.
Citation
APA: (1972) OFR-97(2)-75 Report Of Qualification Test U.S. Bureau Of Mines Connector Development
MLA: OFR-97(2)-75 Report Of Qualification Test U.S. Bureau Of Mines Connector Development. The National Institute for Occupational Safety and Health (NIOSH), 1972.