Olympic Dam Operation - An Overview of Underground Design and Planning

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
369 KB
Publication Date:
Jan 1, 1999

Abstract

Olympic Dam Operation is located in the Stuart Shelf Geological Province approximately 520 km north-north-west of Adelaide in South Australia. It is estimated to be one of the worldÆs top five copper orebodies by size and the biggest single occurrence of uranium. The deposit was discovered by Western Mining Corporation in 1975. Exploration was based on a conceptual model for the formation of sediment hosted copper deposits together with gravity and magnetic anomalies.The capital cost of the current expansion is estimated to be A$ 1.64 billion. The underground expansion includes a total of 36 km of lateral development, a railway haulage system delivering ore from a series of ore passes to a new crusher station and a significant increase in ventilation capacity and mine services.In the current underground expansion the mining method will essentially remain unchanged. The ore handling system will incorporate some recent advances in technology, improving efficiency and safety standards.Major infrastructure excavations are designed by a team of engineers attached to the Olympic Dam Expansion Project and a number of consulting groups. Once the expansion is fully completed it is expected to increase the current annual underground production level from 3.4 Mt to 9.0 Mt of ore by the year 2000. Mine design engineers working for the Olympic Dam Operation have recently completed a three year final design plan to achieve this target.Access to the existing mine is through the decline and Whenan shaft. The Whenan shaft was originally sunk as an exploration access and later upgraded for hoisting. The 4 km long service decline connecting to the Whenan shaft was later constructed to accommodate the increase in service demand. The Robinson and Sir Lindsay Clark shafts were developed at later stages to cater for the hoisting during and following the expansion lead up.
Citation

APA:  (1999)  Olympic Dam Operation - An Overview of Underground Design and Planning

MLA: Olympic Dam Operation - An Overview of Underground Design and Planning. The Australasian Institute of Mining and Metallurgy, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account