Operating Experience with the QSL-Plants in Germany and Korea

The Minerals, Metals and Materials Society
L. Deininger
Organization:
The Minerals, Metals and Materials Society
Pages:
25
File Size:
765 KB
Publication Date:
Jan 1, 1994

Abstract

The QSL plant in the existing "Betzelius" Stolberg GmbH lead smelter in StolberglGermany was commissioned in August, 1990. Following some modifications to the process and equipment which had become necessary in line with the implementation of this new techno- logy, conclusive operating results are now available. These will be reported together with a short description of the plant design. In May 1992, raw material feeding to the QSL reactor in the new lead smelter of Korea Zinc Co. in OnsanlKorea was started. As all the experience gained up to that point in time in the Stolberg plant had already been incorporated in this plant prior to start-up, it reached stable, satisfactory operating conditions in a short period of time. After an introductory description of the plant important operating results will be reported. The operating experience gained in the two plants fully confirms the correctness of the in- ventors' creative ideas in the 70s. The QSL process meets all demands made on modern, ecologically compatible and energy-saving lead production technology. The paper ends with suggestions on how the QSL process will be optimized further in the future.
Citation

APA: L. Deininger  (1994)  Operating Experience with the QSL-Plants in Germany and Korea

MLA: L. Deininger Operating Experience with the QSL-Plants in Germany and Korea. The Minerals, Metals and Materials Society, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account