Operating Improvements at the Phelps Dodge Chino Smelter (Abstract)

The Minerals, Metals and Materials Society
B. G. Belew
Organization:
The Minerals, Metals and Materials Society
Pages:
1
File Size:
21 KB
Publication Date:
Jan 1, 1993

Abstract

Recent operating improvements at the Phelps Dodge Chino Smelter, coupled with intensive capital expenditures since 1987, have resulted in a safer, higher quality, more productive smelter. This paper briefly reviews the flowsheet of the Chino Smelter with emphasis on recent capital expenditures. The main focus of the paper is to provide case studies of how operating functions have been improved. Case studies presented include: (1) safety, (2) anode quality control, (3) flash furnace cross-over build-up control, and (4) flash furnace temperature control. Most of these accomplishments have been achieved by providing specific measurable goals and subsequent feedback to operating crews.
Citation

APA: B. G. Belew  (1993)  Operating Improvements at the Phelps Dodge Chino Smelter (Abstract)

MLA: B. G. Belew Operating Improvements at the Phelps Dodge Chino Smelter (Abstract). The Minerals, Metals and Materials Society, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account