Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 12
- File Size:
- 797 KB
- Publication Date:
- Jan 1, 2007
Abstract
Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying its facilities. Currently it is producing 210,000tpa primary copper, and the new phase of expansion project with a target capacity of 350,000tpa primary copper is ongoing. This paper reviews problems and improvements made with operation and equipment in the past years. Recent plant operation is briefly described. The expansion projects completed are summarized and the ongoing expansion project is present.
Citation
APA:
(2007) Operation Optimization and Capacity Expansion in Jinlong Copper Flash SmelterMLA: Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.