Operations at Canadian Copper Refiners Limited

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 15
- File Size:
- 10021 KB
- Publication Date:
- Jan 1, 1960
Abstract
"OPERATIONS at Canadian Cop-per Refiners Limited, since the refinery was established in 1931, have been described in previous papers ( 1,2). Since then the refinery has treated the entire copper output of Noranda Mines Limited and Hudson Bay Mining & Smelting Company Limited. With the commencement of production in 1956 at Gaspe Copper Mines Limited, this copper has also been refined. From the start of operations to the end of 1958, the following had been refined: copper, silver, gold, selenium and tellurium.Construction of new buildings and additions to other buildings have been needed to handle increased receipts. The refining capacity has been increased from 112,000 tons of copper per year to a total of 236,000 tons per year.The refinery is located at Mont-real East, Quebec, close to railway and highway facilities. Incoming materials and shipments, with some small exceptions, are handled by rail. Some finished products are sl1ipped by industrial flatcar to the adjoining plants of Canada Wire & Cable Company Limited and Noranda Copper & Brass Limited."
Citation
APA:
(1960) Operations at Canadian Copper Refiners LimitedMLA: Operations at Canadian Copper Refiners Limited. Canadian Institute of Mining, Metallurgy and Petroleum, 1960.