Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 3
- File Size:
- 135 KB
- Publication Date:
- Jan 1, 2003
Abstract
The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of open cast operation in space and in time and solving of optimisation problems in timely regime it is necessary using of complex logical and calculation procedures.
Citation
APA:
(2003) Optimisation of Excavator Performance When Mining Complex Polymetallic OresMLA: Optimisation of Excavator Performance When Mining Complex Polymetallic Ores. The Australasian Institute of Mining and Metallurgy, 2003.