Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 257 KB
- Publication Date:
- Jan 1, 2007
Abstract
Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recovery during high mill throughput and high feed grade periods. Installation of the columns has allowed the relatively coarse, well-liberated rougher concentrate and the relatively fine, low-grade scavenger concentrate to be treated separately, improving metallurgical performance in the cleaner circuit. Plant results show that the columns produce a high-grade concentrate at an average stage copper recovery of approximately 80 per cent. There is also indication of increases in both overall plant copper recovery and final concentrate copper grade. In addition, the operability and stability of the cleaner circuit has greatly improved.
Citation
APA:
(2007) Optimisation of Flotation Circuit Configuration at PT Newmont Nusa TenggaraMLA: Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara. The Australasian Institute of Mining and Metallurgy, 2007.