Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

The Australasian Institute of Mining and Metallurgy
J Bower
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
3678 KB
Publication Date:
Jan 1, 2009

Abstract

The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by the confidence categories. Another approach includes application of the quantitative geostatistical criteria for non-subjective and consistent definition of the resource categories. This approach, which has become increasingly popular in the mining industry, provides a quantitative measure of the resource estimation uncertainty. In this study, uncertainties associated with the different drilling grids at the Weipa bauxite deposit (Queensland, Australia) have been modelled using conditional simulation methodology. Criteria used at Weipa for defining resource categories are as follows: mineralisation can be classified as a Measured Resource if tonnage and grade of its volume representing three months of production can be estimated with a precision error not exceeding ¦10 per cent (at 95 per cent probability, ie two standard deviations); and mineralisation can be classified as an Indicated Resource if grade and tonnage of its volume representing annual production can be estimated with a precision error not exceeding ¦10 per cent (at 95 per cent probability). Several different grids have been created by subsampling the drill hole database. The studied variables include Al2O3, SiO2, thickness of the bauxite seam and location of the footwall contact. The variables have been modelled by sequential Gaussian simulation. Based on this study the following drill spacings have been recommended: Measured Resources û 150 m by 150 m, Indicated Resources û 300 m by 300 m.
Citation

APA: J Bower  (2009)  Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

MLA: J Bower Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation. The Australasian Institute of Mining and Metallurgy, 2009.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account