Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

The Australasian Institute of Mining and Metallurgy
E K. Chanda M Karakus J Light B Cook
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
568 KB
Publication Date:
Mar 24, 2014

Abstract

The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements such as stope dimensions, required strength and curing time. A large number of samples and uniaxial compressive strength (UCS) tests were conducted at the Angas Zinc Mine (AZM) paste plant and testing facility. Samples were varied in tailings solids content, cement content and sand content. The results of this testing were modelled to determine the UCS relationship to each of the parameters. The output of this modelling was an easy-to-use program that outputs the design mixture given the stope dimensions and required stope backfill-curing time. This allowed flexibility within the mining schedule for curing times of cemented paste backfill stopes. The optimised schedule using the stope specific mix design, when compared to the standard 14-day curing time used previously, resulted in a smoother weekly mine production schedule. For the modelled 12-week period (one quarter) the 14-day curing time would result in an eight-day shutdown of the mill. The cost for each shutdown is in the order of $125 000/d. Due to the unique nature of each mine’s tailings, this exact outcome would not be directly applicable to another paste fill site. However, the process in this report could be followed for another site to achieve a system similar to the output of this project. This would ultimately lead to a more optimised backfill and stoping cycle and a more optimised mine.CITATION:Chanda, E K, Karakus, M, Light, J, Cook, B and Harris, A, 2014. Optimisation of the paste fill cycle at Angas Zinc Mine, Strathalbyn, South Australia, in Proceedings 12th AusIMM Underground Operators’ Conference 2014 , pp 259–264 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: E K. Chanda M Karakus J Light B Cook  (2014)  Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

MLA: E K. Chanda M Karakus J Light B Cook Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia. The Australasian Institute of Mining and Metallurgy, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account