Optimising Open Pit Mine Production Scheduling by Graph Theory

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 282 KB
- Publication Date:
- Jan 1, 2003
Abstract
A mathematical model is set up to solve the problem of optimal design of the production scheduling on exacting open pit mine. At the same time, the establishment of model in operation condition and its solution are considered completely. It gives not only algorithm of optimal design but also strict mathematical argumentation in the process of optimal design.
Citation
APA:
(2003) Optimising Open Pit Mine Production Scheduling by Graph TheoryMLA: Optimising Open Pit Mine Production Scheduling by Graph Theory. The Australasian Institute of Mining and Metallurgy, 2003.