Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment

Society for Mining, Metallurgy & Exploration
J. Herhold S. Plaum
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
665 KB
Publication Date:
Jan 1, 2019

Abstract

The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be defined in a wide range of various projects, from underground mining tasks to the construction of engineering structures. Within these projects the conduction of construction work cannot only be defined as absolutely necessary, but sometimes also as optimizing for underground processes (e. g. installation of workshops underground to support the mining processes). Even though the conduction of underground construction might cause positive outcomes concerning the productivity, it also tends to be challenging due to local (sub-surface) conditions and influences. To minimize the risk of failure and sudden events within in the conduction of construction work underground, the tool “work preparation” shall be used. Under the given constraints, such as local influences, expected construction work and set time frame, the conduction of the construction work will be planned in advance by consideration of the construction logistics as well as the selection of a fitted construction technique. PROBLEM DEFINITION Economic Challenges - Raw Material Extraction Enterprises in the construction, mining and raw material extraction industries are increasingly under the pressure to perform economically to sustain their position on the global market. Profitability, efficiency and productivity are the basic conditions to be an active participant on the global market as well as a business partner and contractor for mining and construction projects or projects related to the extraction of raw materials. The completion of large-scale as well as common construction projects above ground has been under the pressure to minimize costs and time whilst maximizing the potential outcome, in the meanings of quality and economic gain, for more than a decade now. Whereas the construction industry has to fight the competition on the market with efficient project outcomes, the mining industry has to find ways to perform efficiently to further conduct the extraction of decreasing raw material deposits. The ongoing exploitation of existing raw material deposits to satisfy the constantly increasing raw material demands world-wide, led to the predicament that economically mineable deposits have decreased dramatically. Even tough mineral deposits do still exist on a global level, near-surface deposits decrease rapidly. Therefore, the extraction of raw materials within mining operations will be relocated further away from the surface in greater depths. With the growing distance from the surface to the mineral deposit, the extraction costs will increase many times over. With that in mind, the extraction costs will increase whilst the economic efficiency will decrease. The extraction of certain deposits will no longer be profitable with the common approach. To further extract raw materials efficiently even in greater depth, companies have to change their practice in different ways. That leads to the fact, if the deposits are in the depths, where the extraction processes won´t be economically, other (support) processes have to be in order to guaranty an economical corporate process itself. This precept will divert the focus from the actual mining process to support processes, where potential for optimization still can be found, as shown in figure 1.
Citation

APA: J. Herhold S. Plaum  (2019)  Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment

MLA: J. Herhold S. Plaum Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment. Society for Mining, Metallurgy & Exploration, 2019.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account