Ore Block Modelling and Structural Geology: Their Intergration

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 353 KB
- Publication Date:
- Jan 1, 1993
Abstract
Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the mineralisation. Once this has been elucidated then the appropriate resource calculation methodology can be employed with a search distance and orientation that is relevant.
Citation
APA:
(1993) Ore Block Modelling and Structural Geology: Their IntergrationMLA: Ore Block Modelling and Structural Geology: Their Intergration. The Australasian Institute of Mining and Metallurgy, 1993.