Ore Haulage

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 698 KB
- Publication Date:
- Jan 1, 1942
Abstract
IN reviewing the design of the ore haulage system for the Morenci project, the reader should bear in mind that the railroad and its equpiment cannot be considered as an independent railroad provided only for the purpose of transporting ore from one point to another, but as an integral part of the operation which begins at the electric shovels loading ore at the mine, and ends where the ore, after having been crushed in the primary crushing plant, is deposited in the bins at the secondary crushing plant. Obviously then, the problem consisted of designing a system that would function to the best possible advantage in complete co-ordination with the other units.
Citation
APA:
(1942) Ore HaulageMLA: Ore Haulage. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1942.