Ore Treatment at Martha Current Operations and Future Directions

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
14
File Size:
1497 KB
Publication Date:
Jan 1, 2001

Abstract

The treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either the competent primary ore or the clay-rich oxide ore.   ò Plant throughput is constrained by milling capacity when treating the competent primary ore. This is not an issue at present as current plant feed is oxide ore from the top of the open-pit, but will become so in future years as the pit deepens. To counter this future threat, ball mill power has been restored to 1100kW through modifications to the drive train. The addition of a crushing circuit may also be necessary.   ò Plant throughput was originally constrained by thickener and leach/adsorption tank issues when treating the oxide are. Changes to plant equipment and operations has seen the removal of these constraints and throughput on this material is no longer a problem.   The most significant issue facing plant staff at present is the high silver grade and its impact on gold recovery. These high grades impact upon recovery through losses caused by insufficient leach and adsorption capacity. To counter this, the geology, mining, and milling teams are working together to blend the high grade silver zones with lower grade ores - this is seen to be the quickest and most cost effective way to deal with the issue. The plant design has also been evaluated with a view to modifying it to cope with the higher silver grades. The viability of these modifications will depend on cost and time (that is, the length of time to implement any modifications versus the length of time to mine out the high silver zones).
Citation

APA:  (2001)  Ore Treatment at Martha Current Operations and Future Directions

MLA: Ore Treatment at Martha Current Operations and Future Directions. The Australasian Institute of Mining and Metallurgy, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account